LINAC 1

Results: 24



#Item
11Status Report May, 2011 Linac #1 in May Specific ・Electric cables were partially damaged, so that electric supplies are still very limited.  Low‐voltage 

Status Report May, 2011 Linac #1 in May Specific ・Electric cables were partially damaged, so that electric supplies are still very limited.  Low‐voltage 

Add to Reading List

Source URL: j-parc.jp

Language: English - Date: 2011-09-12 22:10:02
    12Current Status of J-PARC Facilities  September, 2011 LINAC-1 Immediately after the Earthquake

    Current Status of J-PARC Facilities September, 2011 LINAC-1 Immediately after the Earthquake

    Add to Reading List

    Source URL: j-parc.jp

    Language: English - Date: 2011-12-14 23:59:30
      13STABILITY OF THE HIGH-CURRENT ION BEAM COMPENSATED BY ELECTRON BEAM IN THE INDUCTION LINAC DRIFT GAP FILLED WITH THE DENSE ELECTRON CLOUD V.I. Karas’1, Ye.A. Kornilov1, O.V. Manuilenko1, V.P. Tarakanov2, O.V. Fedorovsk

      STABILITY OF THE HIGH-CURRENT ION BEAM COMPENSATED BY ELECTRON BEAM IN THE INDUCTION LINAC DRIFT GAP FILLED WITH THE DENSE ELECTRON CLOUD V.I. Karas’1, Ye.A. Kornilov1, O.V. Manuilenko1, V.P. Tarakanov2, O.V. Fedorovsk

      Add to Reading List

      Source URL: vant.kipt.kharkov.ua

      Language: English - Date: 2013-12-30 08:56:21
        144 Month Summary after the Earthquake 1  In front of Linac

        4 Month Summary after the Earthquake 1 In front of Linac

        Add to Reading List

        Source URL: j-parc.jp

        Language: English - Date: 2011-09-12 22:10:06
          15Current Status of J-PARC Facilities  October, 2011 LINAC-1 ・ Repair work of inside the building has been completed, while that of exterior (e.g., plumbing)

          Current Status of J-PARC Facilities October, 2011 LINAC-1 ・ Repair work of inside the building has been completed, while that of exterior (e.g., plumbing)

          Add to Reading List

          Source URL: j-parc.jp

          Language: English - Date: 2011-12-14 23:59:31
            164 Slow Positron Facility 4-1	Overview The Slow Positron Facility of the Photon Factory, equipped with a dedicated 55 MeV, 600 W linac, provides a high intensity, pulsed slow positron beam [1, 2]. The electrons accelerate

            4 Slow Positron Facility 4-1 Overview The Slow Positron Facility of the Photon Factory, equipped with a dedicated 55 MeV, 600 W linac, provides a high intensity, pulsed slow positron beam [1, 2]. The electrons accelerate

            Add to Reading List

            Source URL: pfwww.kek.jp

            Language: English - Date: 2014-01-29 22:02:57
            17Status after April 4th (Linac #1) Investigation for the interior of cavity ・Setting camera to measure interior ・In so far, no serious problems were found ← Measurement

            Status after April 4th (Linac #1) Investigation for the interior of cavity ・Setting camera to measure interior ・In so far, no serious problems were found ← Measurement

            Add to Reading List

            Source URL: j-parc.jp

            Language: English - Date: 2011-09-12 22:09:46
            18Absolute pulse energy measurements of soft xrays at the Linac Coherent Light Source K. Tiedtke,1 A. A. Sorokin,1,2 U. Jastrow,1 P. Juranić,1 S. Kreis,1 N. Gerken,3 M. Richter,4 U. Arp,5 Y. Feng,6 D. Nordlund,7 R. Soufli

            Absolute pulse energy measurements of soft xrays at the Linac Coherent Light Source K. Tiedtke,1 A. A. Sorokin,1,2 U. Jastrow,1 P. Juranić,1 S. Kreis,1 N. Gerken,3 M. Richter,4 U. Arp,5 Y. Feng,6 D. Nordlund,7 R. Soufli

            Add to Reading List

            Source URL: pubdb.xfel.eu

            Language: English - Date: 2015-02-03 10:02:43
            194 Slow Positron Facility 4-1	Overview The Slow Positron Facility of the Photon Factory, equipped with a dedicated 55 MeV, 600 W linac, provides a high intensity, pulsed slow positron beam [1, 2]. The electrons accelerate

            4 Slow Positron Facility 4-1 Overview The Slow Positron Facility of the Photon Factory, equipped with a dedicated 55 MeV, 600 W linac, provides a high intensity, pulsed slow positron beam [1, 2]. The electrons accelerate

            Add to Reading List

            Source URL: pfwww.kek.jp

            Language: English - Date: 2014-12-07 23:34:44
            20Planned Development Future plans 1 Linac Coherent Light Source  LCLS-II will add two new X-ray laser

            Planned Development Future plans 1 Linac Coherent Light Source LCLS-II will add two new X-ray laser

            Add to Reading List

            Source URL: www.lightsources.org

            Language: English - Date: 2013-02-12 21:25:08